All traffic will be diverted onto the Westbound lane using a one-lane two-way traffic control system.
The Eastbound lane will be used to bring trucks in with asphalt concrete so some minor paving can be done between the existing k-rail and new curb and gutter on the East side of El Portal.
Thank you for your patience.