Work for this week
Prime contractor, Ghilotti Brothers, Inc. (GBI) started demolition of the median area throughout the project limit.
Mike Brown Electric (MBE) started work on installing temporary traffic signals at Robert Miller Drive intersection, so that the medians at the area can be removed.
Work forecasted for next week
GBI will continue with demolition of median.
Electrical subcontractor Mike Brown Electric (MBE) will finish temporary signals at Robert Miler Drive and remove two median street lights closer to Rivers Street in preparation for PG&E to relocate the overhead lines and poles.
For additional project information, visit the City’s website page at http://www.ci.san-pablo.ca.us or contact the City’s Construction Manager, Jaemin Park at (925) 818-3756 or by e-mail: jpark@park-eng.com.
Trabajo para esta semana
Contratista principal, Ghilotti Brothers, Inc. (GBI) comenzó la demolición del área mediana a través de todo el límite del proyecto.
Mike Brown Electric (MBE) comenzó a trabajar en la instalación temporal de las señales de tráfico en la intersección Robert Miller Drive para que las medianas de esta área puedan ser removidas.
Trabajo previsto para la próxima semana
GBI continuara con la demolición de la mediana.
Subcontratista eléctrico Mike Brown Electric (MBE) terminará las señales de tráfico temporales en Robert Miller Drive y removerá dos luces de la calle de las medianas más cerca a la calle Rivers en preparación para que PG&E transadle los postes y líneas aéreas.
Para obtener más información sobre el proyecto, visite la página web de la Ciudad de San Pablo en http://www.ci.san-pablo.ca.us o comuníquese con el Gerente de Construcción de la Ciudad, Jaemin Park al (925) 818-3756 o por correo electrónico: jpark @ park-eng.com.